Featured Project

Trinicity Riverbank

The Arouca Riverbank Stabilization Project, executed in partnership with Trincity Commercial Center Limited (TCCL), showcases Vetiver TT’s commitment to delivering highly effective and cost-efficient erosion control solutions.

We successfully addressed the severe erosion and collapsing river berms that directly threatened the Trincity Mall infrastructure by implementing the revolutionary Vetiver System (VS) alongside rolled coconut matting. Across seven distinct projects, our expert team installed over 36,000 vetiver plants along more than 360 meters of the Arouca Riverbank. This natural, bioengineering approach provides long-term stability, superior erosion protection, and contributes significantly to flood mitigation and groundwater recharge, proving the Vetiver System is the sustainable and smart choice for protecting valuable land and infrastructure.